000 | 00911pam a2200265 a 4500 | ||
---|---|---|---|
001 | 001132613 | ||
003 | AM-YeNLA | ||
005 | 20190508154939.0 | ||
008 | 860225s1986 gw a b 000 0 eng | ||
020 | _a0387164367 (U.S. : pbk.) | ||
020 | _a3540164367 | ||
040 |
_aDLC _cDLC _dDLC |
||
041 | 0 | _aeng | |
082 | 0 | 0 |
_a658.5/03 _219 |
245 | 0 | 0 |
_aMulti-stage production planning and inventory control / _cedited by S. Axsater, Ch. Schneeweiss, and E. Silver. |
260 |
_aBerlin ; _aNew York : _bSpringer-Verlag, _cc1986. |
||
300 |
_aiv, 264 p. : _bill. ; _c25 cm. |
||
440 | 0 |
_aLecture notes in economics and mathematical systems _v266 |
|
504 | _aIncludes bibliographies. | ||
650 | 0 | _aProduction planning. | |
650 | 0 | _aInventory control. | |
700 | 1 |
_aAxsater, Sven, _d1941- _4edt |
|
700 | 1 |
_aSchneeweiss, Christoph A., _d1937- _4edt |
|
700 | 1 |
_aSilver, Edward A. _4edt _g(Edward Allen), _d1937- |
|
999 |
_c995274 _d995274 |